Company Specifics PRINT PDF

Energoprojekt

  • Category: Unknown
  • Address: Bul. Mihaila Pupina 12, 11070 Belgrade, Serbia
  • Phone/fax: (+381 11) 31011 11
  • E-mail: http://eng.energoprojekt.rs/kontakt.php
  • Web: http://eng.energoprojekt.rs/
  • Number of employees: 2753

  • Yearly income: N/A


Since 1951 when founded as a consulting company Energoprojekt has developed into a complex business system integrating, today, 18 companies in the country and over 40 subsidiaries and joint venture companies abroad.

Energoprojekt has acquired the reputation of a reliable partner and in the course of a period of 57 years it has developed a large spectrum of activities, always offering the highest quality and standards, in the following fields: energy, town planning and environmental protection, infrastructure, architecture, industry, information technologies, trade, real estate, insurance and re-insurance, bond trading and financial mediation, industrial manufacture programs and graphic multi media engineering and digital printing.

In the course of its successful development into one of the leading world-wide companies in the fields of consulting and contracting activities Energoprojekt has been engaged in implementation of various projects and facilities in over 70 countries all over the world. The name of Energoprojekt can be found on the lists of Top International Design firms and International Contractors published every year by the renowned Americal magazine "Engineering News Record". Successfully completed projects which Energoprojekt realized in the past are the best reference for acquiring new jobs. As a reliable partner with international experience, easily adaptable to various market requirements and flexible, Energoprojekt successfully cooperates with domestic and foreign partners in realization of important investment projects.

Today, Energoprojekt is a complex business system ready to offer large-scale and high quality services in Serbia and abroad.

 


Projects

  • Bajina Basta reversible hydro-electric power plant

  • Year: 1983 Budget: N/A
  • Reversible pumping plant "Bajina Basta" is the second phase of the hydroelectric power station system "Bajina Basta". On the mountain of Tara two rock-filled dams were built which form the accumulation of 150x10 million m3. See more


  • Mratinje hydro-electric power plant

  • Year: 1976 Budget: N/A
  • The hydroelectric power station is located on the river Piva in Montenegro, about 10 km upstream from the confluence of the Tara and the Piva, in the narrowest part of the Piva canyon. See more


  • Haditha hydro-electric power plant

  • Year: 1987 Budget: N/A
  • The Haditha dam on the Euphrates is rock filled, with a dolomite central core and an asphalt-concrete diaphragm. See more


  • Makis water purification plant

  • Year: 1987 Budget: N/A
  • To supply the town of Belgrade with water, the purification plant "Makis" was designed and constructed to process the Sava river water into drinking water. See more


  • Seremban-Aver Hitam motorway

  • Year: 1988 Budget: N/A
  • The motorway Seremban - Ayer Hitan, section Ayer Keroh - Pagoh in Malaysia is 56 km long, with two carriageways and one shoulder lane (2x4.67x2.15) on both sides, and a median strip of variable width. See more