The housing estate was carried out in the IMS skeleton and panel system (industrial assembly system), classical building by syporex blocks, as well as cast concrete structure.
Detail design:
Komgrap, Elektron, Pobeda
Sub-contractor:
Komgrap, 7. juli, Ratko Mitrovic, Napred, Dom, Trudbenik
Author:
IMEL
Designer:
Napred, Institute for Architecture and Town Planning of the Faculty of Architecture, Designing Bureau Architecture and Town Planning
Structure Designer:
Institute of Material Testing of Serbia
The complex consists of residential buildings, transformer station, sub-stations, shelters etc. The buildings vary in their height ranging one floor to groundfloor plus four floors plus an attic.