Raw water tapping from the water intake on the Rzav river and transport to the water treatment plant.
Detail design:
Institute for Water Management "Jaroslav Cerni"
Sub-contractor:
Jedinstvo, Novi Kolektiv, Gradjevinar, Progres
Designer:
Mihajlo Radosavljevic, Sonja Pavlovic, Dragan Zdravkovic, Dejan Divac
Raw water purification up to the drinking water quality and pure water distribution in five directions (gravitational pipeline to 4 consumers and displacement pipeline to one consumer).
§ Temporary water intake of raw water - raw water pipeline Ø 1,200 mm and raw water pumping station capacity Q = 1,300 1/s; water treatment plant capacity Q = 1,300 1/s (pre-chlorination, coagulation, flocculation, sedimentation, ozonization, filtration, disinfection, fluoridation); pure water pipelines: reinforced concrete pipelines Ø 1,200 mm, Ø 1,000 mm and Ø 800 mm, in the length of 20,300 m; steel pipelines Ø 1,100, Ø 1,000, Ø 800, Ø 500 and Ø 600 mm in the length of 50,500 m, and cast iron pipelines Ø 500 and Ø 300 in the length of 500 m.