Project Details PRINT PDF

Belgrade - Bar railway tunnels

Goles is a single-track railway tunnel with one side inclination 11%0, 4,967 m long. Also, 1,312 m of tracks and 131 m of viaducts were built.


  • Employer: The Directorate for Construction of the Railroad Beograd-Bar
  • Location: Belgrade-Bar
  • Total cost of project: N/A
  • Years of construction: 1968 - 1975
  • Category: Transport
  • Status: Finished
  • Area: Unknown
  • Contractor: Tunelogradnja

Detail design:
The Institute for Traffic CIP

Sub-contractor:
Hidrotehnika

Photo Gallery

Information

The tunnel pierced the mountain composed of diabase, serpentines and the like. Large quantity of water occured thereby.

§ The "Ribnica" comprises seven tunnels, the longest being 489 t11, and the total tunnel length 1,535 m. Besides, 2,320 m of tracks and 790 m of other structures (bridges, viaducts, culverts) were built.

§ The quantity of works:
- open pit excavation 260,000 m3,
- tunnel excavation 273,000 m3,
- concrete for tunnels and other structures 97,000 m3.


Press clipping

  • There is no press clipping for this project