Year: 1989 Budget: N/A
Within the port of Reni, PIM built the following: operational hall for docking of cargo ships total length 1,200 m; operational shore for clocking of boats, 100 m. See more
Year: N/A Budget: N/A
Ivain Milutinovic - PIM constructed the entire port in two phases. See more
Year: 1993 Budget: N/A
Raw water tapping from the water intake on the Rzav river and transport to the water treatment plant. See more
Year: 1987 Budget: N/A
To supply the town of Belgrade with water, the purification plant "Makis" was designed and constructed to process the Sava river water into drinking water. See more
Year: 1986 Budget: N/A
Ii is a rock-filled dam with clay core, 106 m high, 468 m long in the crest, 12 m wide in the crest. The width in the base is 380 m, and the volume of accumulation 146x10 million m3. See more
Year: 1987 Budget: N/A
The Haditha dam on the Euphrates is rock filled, with a dolomite central core and an asphalt-concrete diaphragm. See more
Year: 1976 Budget: N/A
The hydroelectric power station is located on the river Piva in Montenegro, about 10 km upstream from the confluence of the Tara and the Piva, in the narrowest part of the Piva canyon. See more
Year: 1983 Budget: N/A
Reversible pumping plant "Bajina Basta" is the second phase of the hydroelectric power station system "Bajina Basta". On the mountain of Tara two rock-filled dams were built which form the accumulation of 150x10 million m3. See more
Didn’t find what you were looking for?
Contact us now so we could help you get the wanted information.
If you want to present your project on SerbiaConstruction.com website, or if you believe that we missed some important projects, please contact us. Also, if you believe that there is incorrect information about any project, don't hesitate to get in touch with us.