Project Details PRINT PDF

Ivanium

In the very center of Belgrade, at a distance of only 150 metres from Terazije square, a business trade center with a hotel is being built. The total area of this facility is 10.700 m2, divided into 3 underground and 7 above ground levels.


  • Employer: Grading Invest
  • Location: Belgrade
  • Total cost of project: N/A
  • Years of construction: 2003 - 2006
  • Category: Business Centres, Sports Complexes And Congress Halls
  • Status: Finished
  • Area: 10.700 m²
  • Contractor: Grading Invest

Author:
Stevan and Tanja Micic

Project Manager:
ABA engineering

Photo Gallery

Information

This multifunctional facility consists of four areas:
- Shopping Center (total area of 3500 square metres)
- Hotel (total area of 2800 square metres)
- Garage (approximately 2600 square metres)
- Business Apartments (total area of 1800 square metres)

Hotel
The hotel is situated in the centre of Belgrade and is close to many important locations and traffic connections in the city. The hotel has obtained a four-star rating and is intended mainly for businessmen, since the offer is based on complete service for guests who come for business purposes.

Business Apartments
There are 22 business apartments in Ivanijum that vary in size from 45 square metres to 150 square metres.

Shopping Centre
The shopping mall in this building consists of 105 commercial units with designed interiors, which are connected to the public area and arranged on three different levels.

Underground Garage
The undeground garage consists of 80 internal parking places (20 of which belong to the hotel), which are exclusively intended for the owners and users of this multifunctional complex.

 Images: skyscrapercity


Press clipping