Project Details PRINT PDF

Jengiz Khan

The building consists of a hotel and a congress centre of the total area 26,656 m2 with the optimum annual capacity of 129,600 visitors. It is in the final stage of construction. The structure is reinforced concrete and the facade is in combination of stone and glass.


  • Employer: Mongolimex - Ulan Bator
  • Location: Ulan Bator, Mongolia
  • Total cost of project: N/A
  • Years of construction: N/A - 1993
  • Category: Business Centres, Sports Complexes And Congress Halls
  • Status: Finished
  • Area: 26.656 m²
  • Contractor: Generalexport, Rad

Detail design:
Bureau 71, Mašinoprojekt Kopring

Author:
Jurij Printes, BSc (arch.) and Peter Kersovani, BSc (arch.)

Designer:
Peter Kersovani, BSc (arch.) - interior

Structure Designer:
Tihomir Djokic, BSc (civil eng.)

Installation Designer:
Projektomontaža

Photo Gallery

Information

The building is airconditioned with the modern computer equipment.

§ The hotel has 360 beds, two presidential suites, 3 suites, 112 double bed-rooms and 30 single becl-rooms, a swimming pool, a sauna, a clinic, a gym, two restaurants with a kitchen, a banquet hall, hairdresser shop, supermarket and a duty-free shop.

§ The congress centre has a large hall with 1500 seats and a cinema hall with 400 seats, offices, press centre and so on.


Press clipping

  • There is no press clipping for this project