Project Details PRINT PDF

Makis water purification plant

To supply the town of Belgrade with water, the purification plant "Makis" was designed and constructed to process the Sava river water into drinking water.


  • Location: Belgrade
  • Total cost of project: N/A
  • Years of construction: 1985 - 1987
  • Category: Hydro-Engineering Projects
  • Status: Finished
  • Area: Unknown
  • Contractor: KMG Trudbenik

Detail design:
Energoprojekt

Sub-contractor:
Energoprojekt, Mostogradnja, Ratko Mitrovic, Janko Lisjak

Designer:
V. Misita, Energoprojekt, B. Petrovic

Photo Gallery

Information

§ The first stage is of the capacity 2 m3/s. On the basis of the technological treatment process, the plant consists of the following individual structural units: input structure, raw water pumping station "Sava", divisional pool, pre-treatment and clearing, ozonization, filter service building, pure water reservoir, pure watt pumping station, aerator, mud treatment, chemical building, pumping station for balancing reservoir re-circulation, control-laboratory centre.

§ In order to meet very strict functional requirements due to non-uniform subsidence, the main structures of the filter line, clearing and ozone filters, were founded on the "Franci" piles dia 520 mm, length 15 m.

 