Project Details PRINT PDF

Panchevo bridge

The original bridge was built by the German companies, Siemens-Baunnion GmbH from Berlin, and Luxemburgische Bergwerks und Hütten A.G. from Dortmund.


  • Location: Belgrade
  • Total cost of project: N/A
  • Years of construction: N/A - 1946
  • Category: Bridges
  • Status: Finished
  • Area: Unknown
  • Contractor: Siemens-Baunnion GmbH Berlin, Luxenburgiste Bergwerke und Hutten A.G. Dortmund

Detail design:
Vladimir Aleksandrovich Golovko

Photo Gallery

Information

First company supplied the pillars for the bridge. Work of these two companies was a part of the reparations Germany had to pay to Serbia for the damages committed during the World War I.

In 1946, the bridge was originally intended to be just a railway bridge but later it was opened for the road traffic, too. Today, it has two lanes in both directions for road traffic, and even though it was designed to have two rail tracks as well, at the moment there is only one rail track on the bridge.

Total length of the steel made bridge is 1,526.4 meters, of which 1,134,7 meters is over the river bed. The height of the main supporting pillars is 18 meters.

 

Source: wikipedia