It is a railway project for long distance, suburban and city traffic, including a shunting station with attached tracks a descending ramp, shunting and loading-unloading group of tracks etc.
Detail design:
The Institute for Traffic CIP
Designer:
Prof. Savo Janjic, Dusan Nikolic
§ The works began in 1974 by building the bridge across the river Suva and the tunnels "Vracar" and "Dedinje".
§ In the complex on the part of passenger and goods transport system the following was built:
- 15 single-track tunnels (19,744 m), three tunnels for two tracks (4,431 m), and one multitrack tunnel 200 m long;
- 36 reinforced concrete prestressed railway bridges of the total length 4,960 m and road area of 65,255 m2. and seven carriageway brides 957 m long and road area of 9,840 m2;
- 12 steel single-track bridges of the total length 1,266 m and six bridges for two tracks of total length 2,034 m.
§ The suburban traffic within the complex runs in three directions. The underground station "Vukov spomenik" has been opened.