Silver Tower

The designing started in 1950s. The construction had been interrupted several times until 1986 when "Generalexport" was awarded as main Contractor in the international tender.


  • Employer: Municipality of the city of Warsaw and Wadeco, Consulting Services Co
  • Location: Warsaw, Poland
  • Total cost of project: N/A
  • Years of construction: N/A - 1992
  • Category: Aerial And Other Towers
  • Status: Finished
  • Area: 40.000 m²
  • Contractor: Generalexport

Detail design:
KMG "Trudbenik", Bureau 71

Sub-contractor:
Monter, Ingrad, Tapex

Author:
Leh Robacinski, BSc (arch.)

Designer:
Bureau "Dragisa Brasovan", Trudbenik

Structure Designer:
Milenko Popovic, BSc (civil eng.), Architecture, bureau 71

Installation Designer:
Monter

Photo Gallery

Information

First a reconstruction was executed as well as an adaptation of the skeleton built 20 years ago. After that the works were continued on building a business area of 40,000 m2 with five floors in the low part 25 m high, and 29 floors in the main part of the tower 100 m high. It is built out of steel structure with the facade in aluminum and glass.

§ The business centre consists of four banks, exhibition and artistic galleries, and a number of offices and executive offices equipped according to the highest world standards. The modern engineering-technical installations are automatically regulated and controlled from the computer centre. Within the tower there is an underground garage, too.