Szamotuly oil & margarine plant

The complex includes 70 facilities of various sizes and use and is situated on the area of 25 ha. The total area of the buildings in the complex is 40,000 m2.


  • Location: Poland
  • Total cost of project: N/A
  • Years of construction: 1989 - 1992
  • Category: Industrial And Energy Supply Plants
  • Status: Finished
  • Area: 40.000 m²
  • Contractor: Enim, Minel

Detail design:
Energoprojekt

Sub-contractor:
KMG Trudbenik, Vatrostalna

Designer:
Bogoljub Goloskokovic, Djordje Kanjo, Ljubisav Popovic

Installation Designer:
Milan Stanic, Vojislav Graovac, Nedeljko Savcic

Photo Gallery

Information

The complex has a number of technological units: oil and margarine production, manufacture of the packing materials, infrastructure and power supply.

§ Among the characteristic buildings built by KMG "Trudbenik", one to be pointed out is the foundation for reinforced concrete chimney 96 m high, which was erected by "Vatrostalna" as sub-contractor. KMG "Trudbenik" constructed a battery of 10 silos for rapeseed of the total capacity 50,000 t, representing one third of the yearly rapeseed needs. Silos have dia 19 m and the height 32 m. The silos foundation was made in a shallow pit on one single foundation slab. The weigh of all silos is about 50,000 tons.

§ The planned capacities. are:
- 60,000 t of various oils;
- 90,000 t of crushed oil seeds for fodder;

§ The range of ready made products shows the size of this complex:
- 35,000 t crude oil;
- 25,000 t margarine;
- 13,000 t edible oil (in tanks);
- 12,000 t edible oil packed;
- 8,000 t oxygen in cylinders.

§ The factory complex has its own power plant with three boilers and a turbine for electrical power production.