The structure is built as a steel construction with ceramsite and brick walls.
Detail design:
Inzenjering, GOSA
Sub-contractor:
GOSA
Designer:
G. Maric, S. Petrovic, R. Duvljak
The facade walls and the roofing are of steel sandwich-type sheeting. In two out of seven constructed and interconnected structures, there are crane paths and mounted cranes. The structures are of different heights (20 to 30 m), depending on the technological process.
§ Beside the factory, there are built: warehouses, storage bunke and mixers, drying and packing premises, etc.
§ The production of zeolite is under the technology prepared by the Institute for Physical Chemistry in Beograd, and the company "Birac" from Zvornik. The whole complex is provided with necessary installations for strong and weak current, heating and ventilation, water supply and sewage.