Energoprojekt: Projects

  • Bajina Basta reversible hydro-electric power plant
  • Bajina Basta reversible hydro-electric power plant

  • Year: 1983 Budget: N/A
  • Reversible pumping plant "Bajina Basta" is the second phase of the hydroelectric power station system "Bajina Basta". On the mountain of Tara two rock-filled dams were built which form the accumulation of 150x10 million m3. See more


  • Mratinje hydro-electric power plant
  • Mratinje hydro-electric power plant

  • Year: 1976 Budget: N/A
  • The hydroelectric power station is located on the river Piva in Montenegro, about 10 km upstream from the confluence of the Tara and the Piva, in the narrowest part of the Piva canyon. See more


  • Haditha hydro-electric power plant
  • Haditha hydro-electric power plant

  • Year: 1987 Budget: N/A
  • The Haditha dam on the Euphrates is rock filled, with a dolomite central core and an asphalt-concrete diaphragm. See more


  • Makis water purification plant
  • Makis water purification plant

  • Year: 1987 Budget: N/A
  • To supply the town of Belgrade with water, the purification plant "Makis" was designed and constructed to process the Sava river water into drinking water. See more


  • Seremban-Aver Hitam motorway
  • Seremban-Aver Hitam motorway

  • Year: 1988 Budget: N/A
  • The motorway Seremban - Ayer Hitan, section Ayer Keroh - Pagoh in Malaysia is 56 km long, with two carriageways and one shoulder lane (2x4.67x2.15) on both sides, and a median strip of variable width. See more




Project Search